Some projects previously executed by us are as follows:
S/N |
JOBS |
CLIENT |
STATUS |
1 |
Provision of maintenance and Repairs of Daniel Orifice Boxes in all MPN offshore Locations. |
ExxonMobil. |
Ongoing |
2 |
Carryout Technical Audit, Inspection and Repairs on Black Start Machine – Afam V. |
Afam Power Plc. |
Ongoing |
3 |
Atex Inspection/Certication of Electrical Equipment/ Component and Hazardous areas classifications. |
Commserve Engineering Nigerian Bottling Company |
Ongoing |
4 |
Servicing of Detroit Diesel Engines – Trans Amadi Plant & Omoku Plant. |
First Independent Power Limited – FIPL |
Completed |
5 |
Desilting of drains in Uyo Metropolis |
Akwa Ibom State Environmental protection and waste management agency |
Completed |
6 |
Supply of Manpower-Electrical Engineers, Mechanical Engineers, Technicians, Fitters & Riggers. |
Tabicon Energy |
Completed |
7 |
Installation and Commissioning of 11KVA Transformer |
Nestters & Fetters Ltd. |
Completed |
8 |
Dismantle Assembly and Install Transformer Bus Duct support-Edop Q3 & Q4 |
Westfield Energy- Exxon Mobil |
Completed |
9 |
Provision of Valves maintenance, Repairs Calibration/ Certification |
Tabicon Energy |
Completed |
10 |
Provision of Maintenance of MAR 100 Solar Turbine, Training of the Operators and Procurement of Spare Parts. |
Philtec Group |
Completed |
11 |
Supply of building materials- coconut Refinery. |
VKS Construction |
Completed |
12 |
Procurement and Installation of Stainless Steel Handrails- Administrative Block- Coconut Refinery |
VKS Construction |
Completed |
13 |
Supply of equipment-compressors and water pumps |
Philtec Group |
Completed |
14 |
Carryout Top End overhaul intervention-Gas Compressor Waukesha L7042GSI Engine Driver. |
Philtec Group |
Completed |
15 |
Assessment & Repairs of Detroit Diesel Engine. |
Tabicon Energy |
Completed |
16 |
Building of 5 Class room block, offices and Toilet-Mkpat Enin Special Project 2 |
Emgreat Realities Resources LTD ExxonMobil |
Completed |
17 |
Inspection of GT13E2 Boresope/CTA |
GKL Group |
Completed |
18 |
Assessment and Commissioning of GT13E2. |
GKL Group |
Completed |
19 |
Servicing and calibration of pressure Gauges/ Repairs of fuel Gas Scrubbers-Replacement of demister |
Corlinton Engineering Ltd |
Completed |
20 |
Repairs of Electric Powered Overhead Cranes and Air compressors including Materials and spare parts |
Tabicon Energy |
Completed |
21 |
Overhaul of chemical injection pump (Amfiow/ types) inclusive of Materials and spare Parts |
Geomacks Technical Services Ltd |
Completed |
22 |
Servicing/ Greasing of all manual Valves, inclusive replacement of all defective internal components, painting and testing |
Tabicon Energy |
Completed |
23 |
CAT Engine Drivers/Ariel Compressor Overhaul. |
Corlinton Engineering Ltd. |
Completed |
24 |
Procurement and Installation of Air conditioners- Ikot Abasi Office |
SevenEnergy |
Completed |
25 |
Procurement and Installation of 5KVA inverterUyo Office |
SevenEnergy |
Completed |
26 |
Provision of Vegetation Control Services/ Waste management |
Akwa Ibom State Ministry of Environment and Mineral Resources |
Completed |
27 |
Servicing and calibration of pressure Guages/ Repairs of fuel Gas Scrubbers- Replacement of demister |
Corlinton Engineering Ltd |
Completed |
28 |
Provision of maintenance and Repairs of all Types of fire equipment |
GKL Group |
Completed |